Brand Name : MCLLROY
Model Number : MCL940 ZL940
Certification : CE, ISO
Place of Origin : SHANGDONG ,CHINA
MOQ : 1 set
Price : $ 4000-6000 /Unit
Payment Terms : 30% T/T in advance and 70% balance before shipment/ 100% L/C at sight
Supply Ability : 100 sets / month
Delivery Time : 5-8 working days
Packaging Details : nude ,3 Sets Fasten Packing in 1 40HQ
Engine Model : YUNNEI 4102 Supercharged
Engine power : 76kw 2400rpm
Gearbox model : Automatic gearbox
Engine brand : Powered by Yunnei
Tyre Model : 1670-24
Pressure of tire : 0.25-0.35mpa
--Fair Price: all products are manufacturers direct sales, avoid middlemen to earn price difference, give customers the biggest profit space.
Similar Model:
Cat 903D/906M/907M/908M
XCMG LW156/LW160/LW180/LW186/LW200
Liugong 816C
SDLG LG916 LG918 L918
1.Specification
Model | MCL932 ZL932 | MCL936 ZL936 | MCL940 ZL940 | ||
Rated Load | kg | 1800 | 2000 | 2200 | |
Dipper Bucket Capacity | m³/m | 1.0/1.9m | 1.1/2.0m | 1.2 /2.2m | |
Max.Dump Clearance | mm | 3200 | 3500 | 3500 | |
Dump Reach | mm | 1350 | 1650 | 1650 | |
Overall Size (L*W*H) | mm | 5500*1620*2750 | 6025*2000*3000 | 6330*2170*3080 | |
Engine Model | YN490 | YN4100 Supercharged | YN4102 Supercharged | ||
Rated power | kw | 58 | 65 | 76 | |
speed/min | rpm | 2400 | 2400 | 2400 | |
Gear Box | CVT | 280B Split Torque converter | 280 Split Torque converter | ||
Alex | S-hub reductro | M-hub reductro | L-hub reductro | ||
Operating Weight | kg | 3300 | 5300 | 5800 | |
Articulated | Articulated | Articulated | Articulated | ||
Tyre Size | 20.5-16 | 1670-20 | 1670-24 | ||
Joystick included | Mechanical | Mechanical | Mechanical | ||
Aircon | included | included | included | ||
Hydraulic pilot(option) | *** | Without | Without | ||
running hour meter | running hour meter | running hour meter | running hour meter | ||
air brake | air brake | air brake | air brake |
2.Details and advantages
1.High Reliability Upgraded & enhanced front & back frames Reinforced counterweight Fully optimized layout of pipes Waterproof connectors Improved painting process
2.High Efficiency and Energy Conservation Patented dual-pump confluence and diffluence technology Standard models provide the highest dumping height Small turning radius Green, turbocharged, intercooled engine
3.Attachments
This compact wheel loader can be equipped with optional quick hitch , and this quick hitch enables this compact wheel loader to change quickly among multiple attachments, such as hay grapple, grass fork, wood fork, timber grapple, pallet fork, bale grapple, four-in-one bucket, straight snow blade, V-shaped snow plow, snow bucket, drum grab, barrel grapple, snow blower, street sweeper and sand bucket etc.
wheel loader can be installed with different attachments to meet customers' work needs, as following:
4.Production line management
A complete production process mainly includes: material
procurement-steel plate cutting-welding-spray painting
-drying-assembly-inspection.
A complete production process mainly includes: material
procurement-steel plate cutting-welding-spray painting
-drying-assembly-inspection.
There is actually a step before spray painting worth mentioning,
which is shot blast.
The cutting of the steel plate is closely related to the drawing design, workers' technique and cutting equipment.
Normally there are three types of cutting machines, you can see from the pictures here.
Frame cutting is used for iron plates over 40mm thick.
While plasma cutting is for steel plate that in between 20-40mm.
Laser cutting is for steel plate between 8-20mm. It is great for cutting that requires high precision. For example, cutting steel components for bumper, hood, and driver's cab. The advantages of laser cutting are: low temperature, so the plate is not likely deformed; the disadvantage is that it consumes a lot of power.
When the steel sheet is uneven or the cutting speed is not steady, a melting point or breakpoint will form; so during the cutting process, workers need to go back and forth to check.
5.Certifications
CE certificate for wheel loader, backhoe loader,excavator ,mixer
truck .etc.
6.FAQ
Q1.: Are you trading Company or Factory?
A: We are factory. We have been engaged in the production of
concrete mixer ,wheel loader, excavator backhoe loader with pump
for more than 27 years.
Q 2: How about the quality of your products?
A: We are factory with more than 27 years of construction machinery
manufacturing experience. All of our machines are manufactured
strictly according to the national and international standards, and
we take a test on each equipment before delivery. You can also use
Trade Assurance for product quality protection, on-time shipment
protection and payment protection.
Q3: How about the price?
A: We are factory, not dealer, so we can give you a lower price
than those trade companies can.
Q 4: Do you provide after-sale service?
A: Yes. The warranty period of our machines is one year, and we
have a professional after-sale service team to promptly and
thoroughly solve your problems.
Q5 : Do you provide equipment operation training?
A: Yes. We can send professional engineers to the working site for
equipment installation, adjustment, and operation training. All of
our engineers have passports.
Q6.: How long is your delivery time
A: Generally it is around 7 days if the goods in stock. If there is
no goods in stock,
it will be about 20 days, subject to the quantity you ordered.
Q7.: What is your acceptable payment terms.
A: By T/T. 30% deposit in advance, balance to be paid before
delivery.
or By irrocable LC at Sight.
![]() |
0.35mpa Front End Wheel Loader YN4102 Powered Supercharged 76kw For Construction Images |